Project scope: 3 12 unit stacked townhouse buildings

Contractor: Eastern Framing contractors

Contact: Tony Gorham 506-476-4400, easternframing@hotmail.com

Property owner: Gorham Real Estate

Contact: Alex Gorham 506-260-2416, alex@gorhamrealestate.ca

Drawings:

  1. Architectural drawings Building 2
  2. Architectural drawings Building 1 & 3
  3. Structural and foundation drawings Building 1 & 3
  4. Electrical drawings Building 1 & 3
  5. Electrical drawings Building 2
  6. Site grading plan
  7. Site Servicing Plan
  8. Mechanical drawings – No mechanical drawings

Energy Modelling:

  1. Energy report
  2. HRV
  3. Heat pump water heaters
  4. Ductless heat pumps
  5. Appendix A1 proposed building outputs
  6. Appendix A2 reference building outputs

Community master plan:

  1. Master plan
  2. PAC Planning report submission

Permits:

  1. Building A – 198 Serenity Lane
  2. Building B – 186 Serenity Lane
  3. Building C – 174 Serenity Lane

Reports:

  1. Geotechnical report
  2. Environmental study

Renders:

  1. Birds eye view parking lot side
  2. Birds eye view serenity lane side
  3. Parking lot side straight on view
  4. Parking lot side birds eye view from angle
  5. Parking lot view from angle
  6. Street level serenity side united rentals angle
  7. Street level serenity side
  8. Overhead view of Suite A – 1 Bedroom
  9. Overhead view of Suite B – 3 Bedroom (2F)
  10. Overhead view of Suite B – 3 Bedroom (3F)